THE TUUL WATER COMPLEX PROJECT WILL STRENGTHEN ULAANBAATAR’S LONG TERM WATER SECURITY
🇲🇳 The preparation of the Phase I Feasibility Study (FS) for the Tuul Water Complex Project, a strategic initiative aimed at establishing a reliable long term water supply for Ulaanbaatar, has reached 90% completion.
🇲🇳🇮🇳 The feasibility study is being developed by Kalpataru Projects International Limited (KPIL) of the Republic of India. The study includes comprehensive assessments of both groundwater and surface water resources, evaluates water utilization potential, and develops engineering solutions to establish a secure and sustainable water supply system for Ulaanbaatar.
🏗️ Key project specifications:
* ✅ Water storage capacity: 50–100 million cubic meters
* ✅ Dam length: 685.15 meters
* ✅ Dam height: 35.8 meters
* ✅ Reservoir depth: 19.84 meters
* ✅ Catchment area: 5,569 km²
🌿 Once completed, the project is expected to strengthen Ulaanbaatar’s long term water security, maintain the ecological flow of the Tuul River, reduce flood risks, and improve the sustainable management of water resources.
🇲🇳 UBIM is committed to expanding sustainable financing opportunities for the City’s strategic infrastructure projects by promoting capital market based financing solutions and strengthening long term investment frameworks.
💧 Strategic water infrastructure projects of this nature form a critical foundation for enhancing investment attractiveness, improving urban resilience, and supporting sustainable development over the long term.